16.07.2018

WEGH GROUP RECEIVES NEW ORDER FROM VNR (VIETNAM NATIONAL RAILWAYS) FOR 200 LEVEL CROSSING BARRIER MACHINES

In the autumn of this year, WEGH Group SpA will supply Vietnam National Railways (VNR) with a new batch of 200 level crossing barrier machines TD96/2 to be installed in the various compartments of the local rail network. The collaboration on the Italy-Vietnam path, started in 2017, has been consolidated thanks to the great reliability of the 250 barrier machines already operational; the WEGH quality, recognized by VNR and now considered not to be prescindible, lays the foundations for new opportunities in the country. In particular, they will be installed by Vietnamese technicians to protect the numerous road crossings along the most important railway line in the country, which runs from Hanoi to Ho Chi Min City, thus improving safety and making the service more reliable. The barrier machines designed and produced by WEGH Group have been preferred to similar products of other international companies also for their absolute reliability. It should not be forgotten that the WEGH Group has configured the barrier machines specifically for the application context in Vietnam, taking into account some specific requests from VNR technicians. This flexibility is very much appreciated in markets outside Europe.

Share

Last news

25.09.2026

Rome–Civita Castellana–Viterbo railway: first new level crossing activated

  • Signalling systems
  • Product

23.09.2026

WEGH Group to Supply a Long Line Plant for a New Railway Project in Colombia

  • Plants for track system element
  • Product

22.09.2026

WEGH Group Delivers a New Railway Sleeper Plant in Romania

  • Plants for track system element
  • Product

07.09.2026

WEGH Group Earns EcoVadis Gold Medal and Ranks in the Top 5%

  • Other
  • Certifications

24.06.2026

Collaboration with Rete Ferroviaria Italiana (RFI) continues for centralized diagnostics systems for TD96/2 level crossings

  • Signalling systems
  • Product

11.06.2026

WEGH Group upgrades railway sleeper production plant in Mexico

  • Plants for track system element
  • Product

12.01.2026

Arianna® takes centre stage in the Balkans at the Slab Track dedicated event

  • Track systems
  • Product

10.11.2025

ARIANNA®: the WEGH experience that combines technology, sustainability and vision

  • Track systems

22.07.2025

WEGH alongside GCB for the development of the new railway line

  • Plants for track system element
  • Product
4 nuovi lotti

30.06.2025

WEGH: 4 NEW CONTRACTS FOR RAILWAY SLEEPERS, FIRST DELIVERY IN SARDINIA

  • Concrete elements for track system
  • Product