23.09.2026

WEGH Group to Supply a Long Line Plant for a New Railway Project in Colombia

  • Plants for track system element
  • Product

A new railway project in South America will see WEGH Group supply Consorcio Constructor Línea Férrea with a Long Line plant for the production of prestressed concrete railway sleepers intended for the La Dorada–Chiriguaná railway line in Colombia. Shipment of the plant to the customer is expected soon.

The La Dorada–Chiriguaná railway line is a strategic connection for the revitalization of Colombia’s rail transport system. It will help improve links between the country’s inland regions and the railway network leading to the Caribbean ports, supporting the development of freight transport.

A Long Line Plant with a Production Capacity of 800 Sleepers per Day

The WEGH Group Long Line plant will produce prestressed concrete railway sleepers measuring 1,920 mm in length, designed for a railway track gauge of 914 mm.

The plant will have a production capacity of 800 sleepers per day and feature a modular configuration, allowing for future expansions and increased production capacity in line with the customer’s evolving needs.

The plant will consist of two parallel production lines served by the same machinery, thanks to the production concept developed by WEGH Group. The integration of electromechanical solutions and assisted semi-automatic operations will combine flexibility with ease of operation, enabling the customer to maintain continuous control over the different stages of the production process.

From Plant Supply to Railway Sleeper Design

WEGH Group’s contribution will also include the development of the railway sleeper design, including structural calculation reports and the relevant structural calculation validations in accordance with AREMA standards.

This technical support complements the plant supply and highlights WEGH Group’s expertise in designing production solutions and components for railway infrastructure.

The new project for the La Dorada–Chiriguaná railway line further consolidates WEGH Group’s presence in the South American railway market, where the company already has significant references. It represents another opportunity to contribute its know-how and technologies to the development of Colombia’s railway infrastructure.

Share

Last news

23.09.2026

WEGH Group to Supply a Long Line Plant for a New Railway Project in Colombia

  • Plants for track system element
  • Product

22.09.2026

WEGH Group Delivers a New Railway Sleeper Plant in Romania

  • Plants for track system element
  • Product

07.09.2026

WEGH Group Earns EcoVadis Gold Medal and Ranks in the Top 5%

  • Other
  • Certifications

24.06.2026

Collaboration with Rete Ferroviaria Italiana (RFI) continues for centralized diagnostics systems for TD96/2 level crossings

  • Signalling systems
  • Product

11.06.2026

WEGH Group upgrades railway sleeper production plant in Mexico

  • Plants for track system element
  • Product

12.01.2026

Arianna® takes centre stage in the Balkans at the Slab Track dedicated event

  • Track systems
  • Product

10.11.2025

ARIANNA®: the WEGH experience that combines technology, sustainability and vision

  • Track systems

22.07.2025

WEGH alongside GCB for the development of the new railway line

  • Plants for track system element
  • Product
4 nuovi lotti

30.06.2025

WEGH: 4 NEW CONTRACTS FOR RAILWAY SLEEPERS, FIRST DELIVERY IN SARDINIA

  • Concrete elements for track system
  • Product

23.05.2025

WEGH GROUP SUPPORTS ASTRAL IN IMPROVING SAFETY AT LEVEL CROSSINGS

  • Signalling systems
  • Product