28.10.2026
Piazza Baldissera: New Ballastless Tram Track Installation
- Track systems
- Product
11.06.2026
WEGH Group continues to strengthen its presence in the Mexican railway market through a new upgrade project on a prestressed concrete sleeper production plant originally designed and supplied by the Group.
The customer once again chose WEGH Group’s solutions with the goal of increasing productivity and enhancing plant flexibility to meet evolving market demands.
Thanks to the installation of new equipment, the plant can now handle the mixed production of railway sleepers with lengths of 2590 mm and 2400 mm, introducing a new product type and expanding its production capabilities.
This project highlights one of WEGH Group’s key strengths: the design of highly flexible plants for the production of prestressed concrete sleepers. WEGH Group’s solutions are engineered to adapt to different production configurations and efficiently respond to the changing requirements of the railway industry.
For the customer, this investment represents a tangible competitive advantage. Increased production flexibility enables the company to meet different dimensional specifications and participate in tenders requiring various types of railway sleepers.
For WEGH Group, the project demonstrates the strength of a long-standing partnership and further reinforces the Group’s presence in Mexico, one of the most dynamic markets for railway infrastructure development.
25.09.2026
23.09.2026
22.09.2026
24.06.2026
11.06.2026
12.01.2026