11.08.2023

METRA Certification obtained, with maximum level

  • Signalling systems
  • Product

After years of research, development and continuous improvement, WEGH Group is proud to announce that it has obtained certification, in accordance with CEI-EN 50126 – 50129, for a safety integrity level of SIL4, of its innovative turnout handling system: METRA.
METRA is an electro-hydraulic 2-point manoeuvring system for the movement and control of simple railway turnouts with a radius of up to 500 m, track gauge 1435 mm, 60E1 track gauge.
The first manoeuvring point is in a metal sleeper (MET), the second is installed on a reinforced concrete sleeper (ACTUATOR).
The characteristics of this product, such as safety, reliability, availability and maintainability, emerge from the main reference railway specifications as well as from the comparison with our customers and the indications of the maintenance personnel working on the switches in operation, confirming that WEGH Group offers innovative solutions perfected over time.

Share

Last news

25.09.2026

Rome–Civita Castellana–Viterbo railway: first new level crossing activated

  • Signalling systems
  • Product

23.09.2026

WEGH Group to Supply a Long Line Plant for a New Railway Project in Colombia

  • Plants for track system element
  • Product

22.09.2026

WEGH Group Delivers a New Railway Sleeper Plant in Romania

  • Plants for track system element
  • Product

07.09.2026

WEGH Group Earns EcoVadis Gold Medal and Ranks in the Top 5%

  • Other
  • Certifications

24.06.2026

Collaboration with Rete Ferroviaria Italiana (RFI) continues for centralized diagnostics systems for TD96/2 level crossings

  • Signalling systems
  • Product

11.06.2026

WEGH Group upgrades railway sleeper production plant in Mexico

  • Plants for track system element
  • Product

12.01.2026

Arianna® takes centre stage in the Balkans at the Slab Track dedicated event

  • Track systems
  • Product

10.11.2025

ARIANNA®: the WEGH experience that combines technology, sustainability and vision

  • Track systems

22.07.2025

WEGH alongside GCB for the development of the new railway line

  • Plants for track system element
  • Product
4 nuovi lotti

30.06.2025

WEGH: 4 NEW CONTRACTS FOR RAILWAY SLEEPERS, FIRST DELIVERY IN SARDINIA

  • Concrete elements for track system
  • Product