WEGH GROUP COMPLETED ON SCHEDULE THE NEW TRAM TERMINUS AT THE CERTOSA STATION IN MILAN.

Aug 16, 2017 | Post

WEGH Group completed, on schedule, the construction of the new Certosa tram terminal in Milan. The new terminus, with doubling track, is located along the front of the railway Station.
Thanks to this, Metropolitana Milanese, the client of the project, has improved the interchange between the tram lines bound for Roserio and the Certosa station, along the Passante Ferroviario (railroad loop).

The works carried out included the resolution of interferences with the sub-services, the laying of the tracks on the concrete slab of the new terminus ring, the adaptation of the tracks along via Palizzi to allow the ring to be inserted, the construction of the quays of the new stop called “Certosa S Capolinea”, the adaptation of the existing stop of lines 12 and 19, the construction of the overhead contact line, of the systems for the control of the switches and of all the new public lighting systems for traffic lights and trams.

Particularly interesting was the adoption of an improvement variant for the superstructure: in fact, the system for attaching the rail to the concrete slab, called W-Tram, was used. An attachment that has recognized improved characteristics for durability, less maintenance and, above all, ensures a significant reduction in transmitted vibrations.

WEGH Group, with this job, confirms itself as a competent and reliable partner for the managers of railway, tram and underground infrastructures, in the realisation of interventions even in complex environments such as urban ones.

Related News

WEGH Group e Sedena hanno ottenuto con successo i requisiti AREMA

La traversa progettata per il cliente messicano Sedena, Segreteria de la Defensa Nacional, e prodotta secondo la nostra tecnologia, ha ottenuto la certificazione dell'American Railway Engineering and Maintenance of Way Association (AREMA). Le traversine sottoposte ai...

Ugandan Railway and Wegh Group technology

  The Ugandan Kampala-Namanve-Mukono project represents the last decades biggest railway projects in the entire Uganda territory.   The new railway project is part of the rehabilitation of MGR Track crossing Uganda and has been awarded by Imathia...

Catania: completed the Lot 1 of the Nesima-Misterbianco section of the Circumetnea Railway using ARIANNA Slab Track

WEGH Group has completed the works on the superstructure for the upgrade and transformation of the Circumetnea railway in the urban areas of Catania and Misterbianco and of the sub-underground section up to Paternò. Section between the "Nesima" and "Misterbianco C."...

AUTOMATIC TENSIONING MACHINE WEGH TS20

The combination of advanced electronic systems, combined with modern RFID technology, makes Wegh’s TS20 automatic tensioning machine a flexible and highly efficient machine. The tensioning machine can carry out, autonomously, the necessary technical re-sets,...

WEGH GROUP EXPANDS INTO BULGARIA

With the recent acquisition of 50% of Aquasys JsC, WEGH Group has entered the Bulgarian market for the production of concrete railway sleepers through its controlled subsidiary Balgarski Betonni Elementi JsC. (BBE) BBE, based in Svishtov, is the leading Bulgarian...

UNDER SLEEPER PAD AUTOMATIC POSITIONING WEGH PT-MF20

The continuous WEGH Group technological innovation has led to the development of an innovative system for the positioning of Under Sleeper Pads (USP) on railway sleepers, a patented solution. The PT-MF20 automatic USP positioning machine, designed in accordance with...

NEW METRIC GAUGE RAILWAY SLEEPERS

WEGH Group S.p.A.’s Business Unit for Artefacts for the Railway Equipment has obtained the conformity assessment of the new Metric Gauge pre-stressed concrete railway sleepers, specifically designed for the Italian market. The new railway sleepers are intended for use...

WEGH GROUP DONATED AN AMBULANCE TO THE GREEN CROSS FORNOVESE

During this long pandemic period, we asked ourselves a question, "What support is WEGH GROUP able to give to the community in which it operates ? " The idea was to donate an ambulance to the Green Cross Fornovese to thank them for the great generosity and sacrifice...

AUTOMATIC BOTTOM HEADING MACHINE RF20

Automatic Bottom Heading Machine RF20 The continuous-improvement process, that has always distinguished WEGH Group through the years, has led to a further major innovation in the WEGH Group production plant. The plant, located in Calcinate (BG), is designed to the...

PATENTS AND R&D IN COVID-19 TIME

The constant search for technological improvements has always characterized the spirit of innovation within the Wegh Group. It is thanks to this mindset that the R&D technical department has developed, registered and patented a synchronized system for the...
error: Content is protected !!