22.07.2025

WEGH alongside GCB for the development of the new railway line

  • Plants for track system element
  • Product

GCB – National Society for Civil Engineering and Construction had the honour of hosting, a few days ago, the Minister of Public Works and Basic Infrastructure, accompanied by the Governor of the Province of Tindouf and an official delegation, at its concrete sleeper production plant in Tindouf, built using WEGH Group technology. They were welcomed by the President and Director General, Abdelghani Ben Jebba, the Director of the Southwest Region, Ben Araj Bousmaha, and the Director of Railways and Technical Installations, Derbal Hassanein.
During the visit, the Minister emphasised the strategic importance of the production plant, describing it as a key element in the national railway project, thanks to its ability to meet infrastructure needs with high quality products.
WEGH Group personnel were on site and had the pleasure of illustrating to the authorities the features and advantages of the Carousel production plant supplied by WEGH Group, a technology that enables high production efficiency, operational continuity and consistent quality standards in the manufacture of concrete sleepers.
We at WEGH Group are proud to contribute actively to a project of such importance for the development of the country’s infrastructure, putting our know-how and industrial capacity at the service of the region. For us, being part of this initiative means participating concretely in the modernisation of the territory, offering reliable, durable and fully integrated solutions.

Share

Last news

10.11.2025

ARIANNA®: the WEGH experience that combines technology, sustainability and vision

  • Track systems

22.07.2025

WEGH alongside GCB for the development of the new railway line

  • Plants for track system element
  • Product
4 nuovi lotti

30.06.2025

WEGH: 4 NEW CONTRACTS FOR RAILWAY SLEEPERS, FIRST DELIVERY IN SARDINIA

  • Concrete elements for track system
  • Product

23.05.2025

WEGH GROUP SUPPORTS ASTRAL IN IMPROVING SAFETY AT LEVEL CROSSINGS

  • Signalling systems
  • Product

19.05.2025

Railway Sleepers: WEGH Group Launches Plant in Algeria

  • Plants for track system element
  • Product
impianto traverse

30.04.2025

The sleepers’ production plant reaches an average of 175 units per hour

  • Concrete elements for track system
  • Plants for track system element
  • Product
stabilimento montemurlo

31.03.2025

WEGH Group expands its Signaling Division facilities

  • Signalling systems
  • Product

31.01.2025

ARIANNA® EVOLUTION: FROM BIRTH TO APPROVAL BY RFI

  • Track systems
  • Product

16.12.2024

TD96/2 – 144V: REACHED 10.000 UNITS!

  • Signalling systems
  • Product

19.11.2024

WEGH Group expands its presence in Nigeria

  • Plants for track system element
  • Product