07.12.2023

Inauguration of the Sassuolo Railway Bridge with WEGH Group’s Ballastless Arianna® System

  • Track systems
  • Product

In the heart of Sassuolo’s ceramic district, the inauguration of the Railway Bridge designed with Ballastless Arianna® System by WEGH Group recently took place with great success. The work, commissioned by Ferrovie dell’Emilia-Romagna (FER), was attended by illustrious guests, including the mayor of Sassuolo, the president of the province, the director of FER, the transport city council member and the president of the Emilia-Romagna region Stefano Bonaccini.
The director of Ferrovie dell’Emilia-Romagna, Stefano Masola, said: ‘We are pleased to announce the completion of this important infrastructure work in just 18 months, without any road interruptions, except for a few hours during a couple of nights in August. This achievement is the result of efficiency and cooperation between the parties involved in the project.”
Those present shared their enthusiasm for the strategic importance of the project, emphasising the key role of the Sassuolo Bridge in solving the problems related to the critical level crossing and facilitating vehicular and rail traffic in the area.
The mayor of Sassuolo said: “This work represents a significant step for our community, improving the quality of life of our citizens and promoting sustainable development.”
The president of the Emilia-Romagna region, Stefano Bonaccini, emphasised the importance of investing in innovative solutions such as the Ballastless Arianna® railway track system, underlining its contribution to modernising infrastructure and enhancing regional connectivity.
The transport city council member added: “This inauguration marks a step forward in the transport sector, demonstrating the region’s commitment to adopting cutting-edge technologies to improve mobility and reduce environmental impact.”
With the presence of such authoritative figures, the inauguration of the Sassuolo Bridge consolidated the importance of investing in innovative infrastructure to stimulate economic development and improve the quality of life in the region.

Share

Last news

10.11.2025

ARIANNA®: the WEGH experience that combines technology, sustainability and vision

  • Track systems

22.07.2025

WEGH alongside GCB for the development of the new railway line

  • Plants for track system element
  • Product
4 nuovi lotti

30.06.2025

WEGH: 4 NEW CONTRACTS FOR RAILWAY SLEEPERS, FIRST DELIVERY IN SARDINIA

  • Concrete elements for track system
  • Product

23.05.2025

WEGH GROUP SUPPORTS ASTRAL IN IMPROVING SAFETY AT LEVEL CROSSINGS

  • Signalling systems
  • Product

19.05.2025

Railway Sleepers: WEGH Group Launches Plant in Algeria

  • Plants for track system element
  • Product
impianto traverse

30.04.2025

The sleepers’ production plant reaches an average of 175 units per hour

  • Concrete elements for track system
  • Plants for track system element
  • Product
stabilimento montemurlo

31.03.2025

WEGH Group expands its Signaling Division facilities

  • Signalling systems
  • Product

31.01.2025

ARIANNA® EVOLUTION: FROM BIRTH TO APPROVAL BY RFI

  • Track systems
  • Product

16.12.2024

TD96/2 – 144V: REACHED 10.000 UNITS!

  • Signalling systems
  • Product

19.11.2024

WEGH Group expands its presence in Nigeria

  • Plants for track system element
  • Product