{"id":5121,"date":"2018-06-25T20:38:59","date_gmt":"2018-06-25T20:38:59","guid":{"rendered":"https:\/\/www.weghgroup.com\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/"},"modified":"2018-06-25T20:38:59","modified_gmt":"2018-06-25T20:38:59","slug":"the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese","status":"publish","type":"post","link":"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/","title":{"rendered":"THE MAYOR OF MILAN GIUSEPPE SALA INAUGURATED YESTERDAY MORNING THE CONSTRUCTION SITE OF THE TRAMWAY TERMINAL OF CERTOSA IN MILAN WHOSE REALIZATION HAS BEEN ENTRUSTED TO WEGH GROUP BY METRO MILANESE"},"content":{"rendered":"

The Mayor of Milan, Giuseppe Sala, yesterday inaugurated the construction site of the new tramway terminal in Certosa, Milan, which will be built by Wegh Group. The construction work started a few days ago with preliminary activities will be completed within the year. Welcoming Mayor Sala during his visit were Wegh Group Administrator Alessandra Belloni and Paolo Galimberti, director of works for Metropolitana Milanese Spa, as well as technicians and workers from the companies involved. The Mayor wanted to know the details of the project, underlining its importance for Milan’s public transport and hoping that the construction schedule will be respected. The visit ended with a short and simple coffee offered to those present – among which there were also many technicians and officials of the Municipality of Milan and Metropolitana Milanese, as well as journalists – by Wegh Group. Alessandra Belloni, in thanking Mayor Sala for having wanted to participate in person at the start of the construction site, invited all those present to the inauguration of the finished work, assuring the maximum commitment of Wegh Group to complete the tramway terminal on schedule. The new terminus stop, with doubling track, is developed along the central front of the FS Station, immediately outside the large roof of the station itself. In this way, the interchange between the tram lines to Roserio and the Certosa station of the Passante Ferroviario will be improved; today they are several hundred meters apart. An important detail is the adoption in the executive design phase of an improved variant for the reinforcement, which provides for the use of the system called W-Tram able to increase durability and resistance over time with a consequent decrease in maintenance operations and their costs. This is a further confirmation of the great experience and professionalism of the Wegh Group in the railway and tramway sector in which it has been successfully operating for over 50 years.<\/p>\n","protected":false},"excerpt":{"rendered":"

The Mayor of Milan, Giuseppe Sala, yesterday inaugurated the construction site of the new tramway terminal in Certosa, Milan, which will be built by Wegh Group. The construction work started a few days ago with preliminary activities will be completed within the year. Welcoming Mayor Sala during his visit were Wegh Group Administrator Alessandra Belloni […]<\/p>\n","protected":false},"author":1,"featured_media":2687,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[22],"tags":[],"yoast_head":"\nYESTERDAY MORNING THE MAYOR OF MILAN GIUSEPPE SALA INAUGURATED THE CONSTRUCTION YARD OF THE CERTOSA RAILWAY TERMINAL IN MILAN, WHOSE CONSTRUCTION HAS BEEN ASSIGNED TO THE WEGH GROUP BY METROPOLITANA MILANESE.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"YESTERDAY MORNING THE MAYOR OF MILAN GIUSEPPE SALA INAUGURATED THE CONSTRUCTION YARD OF THE CERTOSA RAILWAY TERMINAL IN MILAN, WHOSE CONSTRUCTION HAS BEEN ASSIGNED TO THE WEGH GROUP BY METROPOLITANA MILANESE.\" \/>\n<meta property=\"og:description\" content=\"The Mayor of Milan, Giuseppe Sala, yesterday inaugurated the construction site of the new tramway terminal in Certosa, Milan, which will be built by Wegh Group. The construction work started a few days ago with preliminary activities will be completed within the year. Welcoming Mayor Sala during his visit were Wegh Group Administrator Alessandra Belloni […]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/\" \/>\n<meta property=\"og:site_name\" content=\"WEGH Group\" \/>\n<meta property=\"article:published_time\" content=\"2018-06-25T20:38:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.weghgroup.com\/wp-content\/uploads\/2018\/06\/MicrosoftTeams-image-18-1024x576.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"adminwegh\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"adminwegh\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/\",\"url\":\"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/\",\"name\":\"YESTERDAY MORNING THE MAYOR OF MILAN GIUSEPPE SALA INAUGURATED THE CONSTRUCTION YARD OF THE CERTOSA RAILWAY TERMINAL IN MILAN, WHOSE CONSTRUCTION HAS BEEN ASSIGNED TO THE WEGH GROUP BY METROPOLITANA MILANESE.\",\"isPartOf\":{\"@id\":\"https:\/\/www.weghgroup.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.weghgroup.com\/wp-content\/uploads\/2018\/06\/MicrosoftTeams-image-18.png\",\"datePublished\":\"2018-06-25T20:38:59+00:00\",\"dateModified\":\"2018-06-25T20:38:59+00:00\",\"author\":{\"@id\":\"https:\/\/www.weghgroup.com\/#\/schema\/person\/0bda8d88903ec2bf0639cfd133122338\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/#primaryimage\",\"url\":\"https:\/\/www.weghgroup.com\/wp-content\/uploads\/2018\/06\/MicrosoftTeams-image-18.png\",\"contentUrl\":\"https:\/\/www.weghgroup.com\/wp-content\/uploads\/2018\/06\/MicrosoftTeams-image-18.png\",\"width\":3264,\"height\":1836,\"caption\":\"Wegh Group\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.weghgroup.com\/en\/home\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"THE MAYOR OF MILAN GIUSEPPE SALA INAUGURATED YESTERDAY MORNING THE CONSTRUCTION SITE OF THE TRAMWAY TERMINAL OF CERTOSA IN MILAN WHOSE REALIZATION HAS BEEN ENTRUSTED TO WEGH GROUP BY METRO MILANESE\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.weghgroup.com\/#website\",\"url\":\"https:\/\/www.weghgroup.com\/\",\"name\":\"WEGH Group\",\"description\":\"WEGH Group\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.weghgroup.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.weghgroup.com\/#\/schema\/person\/0bda8d88903ec2bf0639cfd133122338\",\"name\":\"adminwegh\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.weghgroup.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/04ec3e918b77d58adad0771929acaf8a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/04ec3e918b77d58adad0771929acaf8a?s=96&d=mm&r=g\",\"caption\":\"adminwegh\"},\"sameAs\":[\"https:\/\/www.weghgroup.com\"],\"url\":\"https:\/\/www.weghgroup.com\/en\/author\/adminwegh\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"YESTERDAY MORNING THE MAYOR OF MILAN GIUSEPPE SALA INAUGURATED THE CONSTRUCTION YARD OF THE CERTOSA RAILWAY TERMINAL IN MILAN, WHOSE CONSTRUCTION HAS BEEN ASSIGNED TO THE WEGH GROUP BY METROPOLITANA MILANESE.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/","og_locale":"en_US","og_type":"article","og_title":"YESTERDAY MORNING THE MAYOR OF MILAN GIUSEPPE SALA INAUGURATED THE CONSTRUCTION YARD OF THE CERTOSA RAILWAY TERMINAL IN MILAN, WHOSE CONSTRUCTION HAS BEEN ASSIGNED TO THE WEGH GROUP BY METROPOLITANA MILANESE.","og_description":"The Mayor of Milan, Giuseppe Sala, yesterday inaugurated the construction site of the new tramway terminal in Certosa, Milan, which will be built by Wegh Group. The construction work started a few days ago with preliminary activities will be completed within the year. Welcoming Mayor Sala during his visit were Wegh Group Administrator Alessandra Belloni […]","og_url":"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/","og_site_name":"WEGH Group","article_published_time":"2018-06-25T20:38:59+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/www.weghgroup.com\/wp-content\/uploads\/2018\/06\/MicrosoftTeams-image-18-1024x576.png","type":"image\/png"}],"author":"adminwegh","twitter_card":"summary_large_image","twitter_misc":{"Written by":"adminwegh","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/","url":"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/","name":"YESTERDAY MORNING THE MAYOR OF MILAN GIUSEPPE SALA INAUGURATED THE CONSTRUCTION YARD OF THE CERTOSA RAILWAY TERMINAL IN MILAN, WHOSE CONSTRUCTION HAS BEEN ASSIGNED TO THE WEGH GROUP BY METROPOLITANA MILANESE.","isPartOf":{"@id":"https:\/\/www.weghgroup.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/#primaryimage"},"image":{"@id":"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/#primaryimage"},"thumbnailUrl":"https:\/\/www.weghgroup.com\/wp-content\/uploads\/2018\/06\/MicrosoftTeams-image-18.png","datePublished":"2018-06-25T20:38:59+00:00","dateModified":"2018-06-25T20:38:59+00:00","author":{"@id":"https:\/\/www.weghgroup.com\/#\/schema\/person\/0bda8d88903ec2bf0639cfd133122338"},"breadcrumb":{"@id":"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/#primaryimage","url":"https:\/\/www.weghgroup.com\/wp-content\/uploads\/2018\/06\/MicrosoftTeams-image-18.png","contentUrl":"https:\/\/www.weghgroup.com\/wp-content\/uploads\/2018\/06\/MicrosoftTeams-image-18.png","width":3264,"height":1836,"caption":"Wegh Group"},{"@type":"BreadcrumbList","@id":"https:\/\/www.weghgroup.com\/en\/the-mayor-of-milan-giuseppe-sala-inaugurated-yesterday-morning-the-construction-site-of-the-tramway-terminal-of-certosa-in-milan-whose-realization-has-been-entrusted-to-wegh-group-by-metro-milanese\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.weghgroup.com\/en\/home\/"},{"@type":"ListItem","position":2,"name":"THE MAYOR OF MILAN GIUSEPPE SALA INAUGURATED YESTERDAY MORNING THE CONSTRUCTION SITE OF THE TRAMWAY TERMINAL OF CERTOSA IN MILAN WHOSE REALIZATION HAS BEEN ENTRUSTED TO WEGH GROUP BY METRO MILANESE"}]},{"@type":"WebSite","@id":"https:\/\/www.weghgroup.com\/#website","url":"https:\/\/www.weghgroup.com\/","name":"WEGH Group","description":"WEGH Group","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.weghgroup.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.weghgroup.com\/#\/schema\/person\/0bda8d88903ec2bf0639cfd133122338","name":"adminwegh","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.weghgroup.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/04ec3e918b77d58adad0771929acaf8a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/04ec3e918b77d58adad0771929acaf8a?s=96&d=mm&r=g","caption":"adminwegh"},"sameAs":["https:\/\/www.weghgroup.com"],"url":"https:\/\/www.weghgroup.com\/en\/author\/adminwegh\/"}]}},"_links":{"self":[{"href":"https:\/\/www.weghgroup.com\/en\/wp-json\/wp\/v2\/posts\/5121"}],"collection":[{"href":"https:\/\/www.weghgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.weghgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.weghgroup.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.weghgroup.com\/en\/wp-json\/wp\/v2\/comments?post=5121"}],"version-history":[{"count":0,"href":"https:\/\/www.weghgroup.com\/en\/wp-json\/wp\/v2\/posts\/5121\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.weghgroup.com\/en\/wp-json\/wp\/v2\/media\/2687"}],"wp:attachment":[{"href":"https:\/\/www.weghgroup.com\/en\/wp-json\/wp\/v2\/media?parent=5121"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.weghgroup.com\/en\/wp-json\/wp\/v2\/categories?post=5121"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.weghgroup.com\/en\/wp-json\/wp\/v2\/tags?post=5121"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}