TRAMWAY OF ROME

TRAMWAY OF ROMETRAMWAY OF ROMETRAMWAY OF ROME
ABOUT

WEGH Group engineered, built and laid the superstructure on approximately 5 km of line running right through the city centre, near historical buildings and densely populated areas.
To speed up laying times, thus minimizing the inconvenience to road traffic, as well as to limit vibrations and the resulting disturbance on surrounding buildings, a ballastless system was chosen (Arianna and floating slab) with the insertion of a special elastomeric bed.
The surface finish, made using prefabricated asphalted slabs in certain areas and paving in others, is completely removable to guarantee quick and easy inspection and maintenance.

 

COUNTRY:

Italy

 

CLIENT:

ATAC

 

YEAR:

1995-1998

 

OVERALL TRACK LENGTH:

5 km

 

TASKS:

designing – manufacturing – laying – maintenance

TRAMWAY SUPERSTRUCTURE