Construtora Norberto Odebrecht, one of the biggest construction groups in the Latin America has chosen WEGH Group in 2010 in order to buy the biggest plant in the world for the production of the pre-stressed reinforced concrete sleepers
With the capacity of 4.800 railway sleepers a day and 12 production lines, the Long-Line plant of WEGH Group has permitted to realized an impressive project, a new railway line “Transnordestina”.
The plant, fist in the world in terms of production capacity, was inaugurated in the presence of The President of Brasil Lula da Silva, who has declared the work as of high importance for the development of the Country.
COUNTRY:
Brazil
CLIENT:
Construtora Norberto Odebrecht
YEAR:
2010
PRODUCTION CAPACITY:
4.800 railway sleeper/day
TASKS:
designing