In this project WEGH Group’s IPA division replaced an entire railway bridge on the Florence – Vada line so that load and speed standards set by the RFI could be met.
The bridge had to be replaced in as short a time as possible to reduce interruptions to rail traffic to an absolute minimum
The dismantling of the old bridge and installation of the new one was carried out in just 48 hours.
ABOUT
COUNTRY:
Italy
CLIENT:
RFI
YEAR:
2004
REALIZATION TIME:
48 hours
TASKS:
designing – manufacturing – laying