PLANT FOR THE PRODUCTION OF SLEEPERS IN ETHIOPIA

PLANT FOR THE PRODUCTION OF SLEEPERS IN ETHIOPIAPLANT FOR THE PRODUCTION OF SLEEPERS IN ETHIOPIA
ABOUT

For the reconstruction of the railway line between Dire Dawa and Djibouti for the Ethio-Djiboutine Railway, the Consta Group has chosen WEGH Group as a partner for the supply of a plant for the production of 300.000 railway concrete sleepers a year in order to replace the existing ones made of steel.
For the project were designed special moulds for the production of sleepers, because the Ethiopian railways have particular characteristics.

 

COUNTRY:

Ethiopia

 

CLIENT:

Mattioli – Consta

 

YEAR:

2007

 

PRODUCTION CAPACITY:

300.000 railway sleepers/year

 

TASKS:

designing