METRO – TRAMWAY MILAN – CINISELLO BALSAMO

METRO – TRAMWAY MILAN – CINISELLO BALSAMOMETRO – TRAMWAY MILAN – CINISELLO BALSAMOMETRO – TRAMWAY MILAN – CINISELLO BALSAMOMETRO – TRAMWAY MILAN – CINISELLO BALSAMO
ABOUT

The route, measuring 8.7 km in all, runs entirely along an embankment. To build it WEGH Group used both a traditional ballast superstructure and ballastless systems.In particular, the ballastless sections involved using a continuous reinforced concrete slab, built on site using the bottom-up method.In certain, particularly sensitive points, a special elastomeric bed was inserted under the superstructure to reduce the disturbance caused by vibrations on the surrounding buildings.

 

COUNTRY:

Italy

 

CLIENT:

Metropolitana Milanese

 

YEAR:

2004 / 2009

 

OVERALL TRACK LENGTH:

8,7 km

 

TASKS:

manufacturing – laying

TRAMWAY SUPERSTRUCTURE