Section of metro line built for Milan’s Line 3 between 2009 and 2011 by WEGH Group IPA Division using the floating slab track discrete support.
Starting from the need to reduce vibrations inflicted on nearby buildings, a study was undertaken to identify the most suitable track system system, with direct realization of the production stages and laying of the track system.
Several points were included along the route and these two were on prefabricated slabs.

 

COUNTRY:

Italy

 

CLIENT:

Metropolitana Milanese

 

YEAR:

2002-2003 / 2009-2011

 

OVERALL TRACK LENGTH:

10 km

 

TASKS:

production – laying