ABOUT

The line 2 section of the Barcelona Metro, which runs near the Sagrada Familia stop, was built with an Arianna M-Slab track system. This made it possible to reduce the space occupied by the system, the vibrations and maintenance costs on the line for a length of approximately 8 km. This activity involved both the engineering and production of the slabs as well as track laying. Several points were included along the route which were also realized on prefabricated slabs.

 

COUNTRY:

Spain

 

CLIENT:

Generalidad de Catalunia

 

YEAR:

1992-1993

 

OVERALL TRACK LENGTH:

8 km

 

TASKS:

designing – production – laying