LINE 2 – METRO OF MILAN

LINE 2 – METRO OF MILANLINE 2 – METRO OF MILANLINE 2 – METRO OF MILANLINE 2 – METRO OF MILAN

 

ABOUT

For line 2 of the Milan metro, we took part in the construction of 2 sections:

 

  • Famagosta-Abbiategrasso, with the production and laying of the floating slab track discrete support and bottom-up execution of the track in other sections
  • Famagosta-Assago, with the production and laying of a traditional ballasted track system and bottom-up execution performed for specific track sections.
    The length of the route involved in the intervention is 10 km and was built to reach the Forum di Assago (an important sports hall).

 

 

COUNTRY:

Italy

 

CLIENT:

Metropolitana Milanese

 

YEAR:

2004-2005 / 2007

 

OVERALL TRACK LENGTH:

14 km

 

TASKS:

manufacturing – laying

UNDERGROUND SUPERSTRUCTURES